Construction background prepared surface of the facade wall of the building with a fixed mesh for cementing and painting
  • Preview image in your
    Facebook Timeline Account

  • Preview

  • Price: 1$
  • Size Facebook: 1702 x 630 px
  • Size Twitter: 1500 x 500 px
  • Size LinkedIn: 1128 x 191 px

More Facebook, Twitter and LinkedIn Cover Photos

Cover photo info

  • Photo title: Construction background prepared surface of the facade wall of the building with a fixed mesh for cementing and painting
  • Author: Sidoroff88
  • Cover photo description:
  • Putty walls on a reinforcing mesh. Wall plastering, mesh or gypsum mesh reinforcement, wall insulation equipment. Construction background prepared surface of the facade wall of the building with a fixed mesh for cementing and painting the facade.
  • Image ID:287198596
  • Views:0
  • Downloads:0

Keywords for Facebook, Twitter and LinkedIn timeline photos

Similar images from Dreamstime

 
x